Innovative bridge designs for rapid renewal : ABC toolkit

"TRB's second Strategic Highway Research Program (SHRP 2) SHRP 2 Report S2-R04-RR-2: Innovative Bridge Designs for Rapid Renewal: ABC Toolkit describes standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report includes design standards and design examples for complete prefabricated bridge systems, and proposes specification language for accelerated bridge construction systems, which adheres to the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design and Construction Specifications. The R04 MathCAD files for the SHRP 2 Report S2-R04-RR-2 are available to help illustrate the sample accelerated bridge construction (ABC) design calculations. The sample design calculations serve as training tools for engineers to increase familiarity with ABC design issues and criteria. A demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04. The following three videos were produced related to the Keg Creek project: ABC for Everyday Bridges (18:39) highlights the specific techniques used to deliver a new bridge with only a 10-day closure. One Design--10,000 Bridges (9:46) describes a tool kit for designing and constructing bridges that brings home the benefits of accelerated bridge construction techniques so local contractors can use typical equipment to build bridges quickly and efficiently. Time-Lapse Video (1:30) shows ABC techniques being used by a local contractor with standard equipment to replace the Keg Creek three-span bridge. SHRP 2 Renewal Project R04 also produced the Innovative Bridge Designs for Rapid Renewal report that documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals"--Publication info.

Open All Close All

http://schema.org/alternateName

  • "ABC toolkit"
  • "SHRP2 reliability research"
  • "SHRP2 strategic highway research program"@en
  • "Bridge designs for rapid renewal"@en

http://schema.org/description

  • ""TRB's second Strategic Highway Research Program (SHRP 2) SHRP 2 Report S2-R04-RR-2: Innovative Bridge Designs for Rapid Renewal: ABC Toolkit describes standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report includes design standards and design examples for complete prefabricated bridge systems, and proposes specification language for accelerated bridge construction systems, which adheres to the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design and Construction Specifications. The R04 MathCAD files for the SHRP 2 Report S2-R04-RR-2 are available to help illustrate the sample accelerated bridge construction (ABC) design calculations. The sample design calculations serve as training tools for engineers to increase familiarity with ABC design issues and criteria. A demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04. The following three videos were produced related to the Keg Creek project: ABC for Everyday Bridges (18:39) highlights the specific techniques used to deliver a new bridge with only a 10-day closure. One Design--10,000 Bridges (9:46) describes a tool kit for designing and constructing bridges that brings home the benefits of accelerated bridge construction techniques so local contractors can use typical equipment to build bridges quickly and efficiently. Time-Lapse Video (1:30) shows ABC techniques being used by a local contractor with standard equipment to replace the Keg Creek three-span bridge. SHRP 2 Renewal Project R04 also produced the Innovative Bridge Designs for Rapid Renewal report that documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals"--Publication info."@en
  • ""TRB's second Strategic Highway Research Program (SHRP 2) SHRP 2 Report S2-R04-RR-2: Innovative Bridge Designs for Rapid Renewal: ABC Toolkit describes standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report includes design standards and design examples for complete prefabricated bridge systems, and proposes specification language for accelerated bridge construction systems, which adheres to the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design and Construction Specifications. The R04 MathCAD files for the SHRP 2 Report S2-R04-RR-2 are available to help illustrate the sample accelerated bridge construction (ABC) design calculations. The sample design calculations serve as training tools for engineers to increase familiarity with ABC design issues and criteria. A demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04. The following three videos were produced related to the Keg Creek project: ABC for Everyday Bridges (18:39) highlights the specific techniques used to deliver a new bridge with only a 10-day closure. One Design--10,000 Bridges (9:46) describes a tool kit for designing and constructing bridges that brings home the benefits of accelerated bridge construction techniques so local contractors can use typical equipment to build bridges quickly and efficiently. Time-Lapse Video (1:30) shows ABC techniques being used by a local contractor with standard equipment to replace the Keg Creek three-span bridge. SHRP 2 Renewal Project R04 also produced the Innovative Bridge Designs for Rapid Renewal report that documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals"--Publication info."
  • ""TRB's second Strategic Highway Research Program (SHRP 2) S2-R04-RR-1: Innovative Bridge Designs for Rapid Renewal documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report also describes a demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa that was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04."--Publisher description."@en
  • ""TRB's second Strategic Highway Research Program (SHRP 2) S2-R04-RR-1: Innovative Bridge Designs for Rapid Renewal documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewals. The report also describes a demonstration project on US 6 over the Keg Creek near Council Bluffs, Iowa that was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04."--Publisher description."

http://schema.org/name

  • "Innovative bridge designs for rapid renewal : ABC toolkit"@en
  • "Innovative bridge designs for rapid renewal : ABC toolkit"
  • "Innovative bridge designs for rapid renewal"@en
  • "Innovative bridge designs for rapid renewal"
  • "Innovative bridge designs for rapid renewal ABC toolkit"