WorldCat Linked Data Explorer

http://worldcat.org/entity/work/id/195773961

Increasing Aircraft Carrier Forward Presence Changing the Length of the Maintenance Cycle

The U.S. Navy currently maintains a fleet of 11 aircraft carriers. These ships, which are among the most powerful and versatile elements of U.S. naval forces, allow the Navy to undertake a wide range of tasks. They are also among the most complex weapon systems operated by the Navy. The carriers themselves need continuous and regularly scheduled maintenance. Their crews require a great deal of training to attain and sustain readiness levels. The length of the training, readiness, deployment, and maintenance cycle (defined as the period from the end of one depot maintenance period to the end of the next), the type of maintenance needed (i.e., docking or non-docking), and the timing of events within the cycle affect the carrier's availability to meet operational needs.

Open All Close All

http://schema.org/about

http://schema.org/description

  • "The U.S. Navy currently maintains a fleet of 11 aircraft carriers. These ships, which are among the most powerful and versatile elements of U.S. naval forces, allow the Navy to undertake a wide range of tasks. They are also among the most complex weapon systems operated by the Navy. The carriers themselves need continuous and regularly scheduled maintenance. Their crews require a great deal of training to attain and sustain readiness levels. The length of the training, readiness, deployment, and maintenance cycle (defined as the period from the end of one depot maintenance period to the end of the next), the type of maintenance needed (i.e., docking or non-docking), and the timing of events within the cycle affect the carrier's availability to meet operational needs."@en
  • "The U.S. Navy's aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier's training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier's availability to meet operational needs. Over the past two decades, the proportion of time in a cycle that a carrier spends deployed has decreased, making it difficult for Navy planners to meet the forward-presence requirements of theater commanders. In future years, as the number of carriers in the fleet fluctuates, this challenge will be compounded. In this study, RAND examines the technical feasibility of different cycle lengths and their effect on the forward presence of Nimitz-class aircraft carriers. The authors assess several one- and two-deployment cycles, assuming a deployment length of six months and a time-between-deployments length equal to twice the duration of the previous deployment. The study also presents an analysis of the impact of different cycles on managing shipyard workloads. Among many findings, RAND concludes that shorter cycles can increase the forward presence of the carrier fleet and help level shipyard workloads. However, these shorter cycles will decrease fleet surge readiness. Longer, two-deployment cycles can increase forward presence, but may result in shipyard workload complications and deferred-work backlogs."@en
  • "The U.S. Navy?s aircraft carriers allow the nation to deter adversaries, bring airpower to bear against opponents, engage friends and allies, and provide humanitarian assistance. However, these powerful and versatile systems need continuous and regularly scheduled maintenance, and their crews require a great deal of training to attain and sustain readiness levels. The length of the carrier?s training, readiness, deployment, and maintenance cycle, the type of maintenance needed, and the timing of events within the cycle affect the carrier?s availability to meet operational needs. Over the past."@en
  • "The U.S. Navy's aircraft carrier fleet must meet the forward presence requirements of theater commanders. With a decreasing fleet size, planners must balance the timing of maintenance, training, and deployment with presence and surge demands. Evaluating multiple one- and two-deployment scenarios per cycle, RAND examines the feasibility of different cycle lengths, their effect on carrier forward presence, and their impact on shipyard workloads."

http://schema.org/genre

  • "Electronic books"@en
  • "Livres électroniques"

http://schema.org/name

  • "Increasing Aircraft Carrier Forward Presence Changing the Length of the Maintenance Cycle"@en
  • "Increasing aircraft carrier forward presence changing the length of the maintenance cycle"
  • "Increasing aircraft carrier forward presence changing the length of the maintenance cycle"@en
  • "Increasing aircraft carrier forward presence : changing the length of the maintenance cycle"
  • "Increasing Aircraft Carrier Forward Presence: Changing the Length of the Maintenance Cycle"@en